IESET.
Hypotheses·energy·eurostat_energy_price_export_competitiveness_panel

Higher industrial electricity prices reduce export competitiveness.

INCONCLUSIVEengine/runs/eurostat_energy_price_export_competitiveness_panel

INCONCLUSIVE_DATA_PENDING — no outcome variable loaded; missing: ['local_batch06_derived']

confidence cueResult card produced; verdict unclassified.

policy briefCoverage too thin

In ordinary language

In plain terms, this asks whether industrial electricity price is actually linked to better or worse export share from 2019 to 2025.

plain answer

This test cannot make a firm call yet. no outcome variable loaded; missing: ['local_batch06_derived']

why it matters

This matters because energy claims should change belief only when they survive a pre-declared empirical test.

how the test works

It compares 31 country or place units from 2019 to 2025, using a panel fe design, with fixed effects for country and year.

what was measured
What changed
  • Industrial electricity price
What we checked
  • Export share
what this does not prove

A single test is not the whole truth. It narrows the claim under a specific sample, time period, and method. Strong policy conclusions need the pattern to survive nearby tests, alternative data, and serious objections.

verification

3 input datasets, 0 unresolved missing series, provenance status: reproducible hash verified.

Results

engine/runs/eurostat_energy_price_export_competitiveness_panel
1007550250201920222025AUTBELBGRCHECYPCZEDEU
illustrative sketch · run pending
No coefficients yet. When the model fires, this chart will show export_share across 31 sampled countries over 20192025.
The shapes above are stylised — none of the lines are real data.
Placeholder for eurostat_energy_price_export_competitiveness_panel. Published chart will be generated from engine/runs/eurostat_energy_price_export_competitiveness_panel/chart_data.json.

Pre-registration

pre-registered
first-spec commit b5accf8 · 2026-05-13T10:34:29Z
run generated · 2026-06-29T17:52:06Z

Higher industrial electricity prices reduce export competitiveness.

Falsification criterion — what would disprove this

set before the run · honoured after

This hypothesis is considered falsified if:

SUPPORTED if treatment coefficient has the predicted sign at p<0.10; REFUTED if opposite sign at p<0.10; otherwise PARTIAL.

formal test & threshold
test:      panel_fe_eurostat_energy_price_export_competitiveness_panel
threshold: p<0.10 with pre-registered sign

Method

Template
panel_fe
Fixed effects
country, year
Clustering
country
Sample
31 countries · 20192025
Evidence type
associational

Short-panel throughput screen; household/distribution claims require additional local tables before running.

Data

VariableSourceTransform
export_share
outcome
local_batch06_derivedlevel_or_growth
industrial_electricity_price
treatment
local_batch06_derivedannual_mean_or_growth
gdp_pc_growth
control
world_bank_wdi:NY.GDP.PCAP.KD.ZGtier 2
level

ready  ·  pending  ·  reconstruct-needed

Detailed result card

Result card — eurostat_energy_price_export_competitiveness_panel

Verdict: INCONCLUSIVE_DATA_PENDING — no outcome variable loaded; missing: ['local_batch06_derived']

Pre-registration

  • Claim: Higher industrial electricity prices reduce export competitiveness.
  • Falsification rule: SUPPORTED if treatment coefficient has the predicted sign at p<0.10; REFUTED if opposite sign at p<0.10; otherwise PARTIAL.
  • Falsification test: panel_fe_eurostat_energy_price_export_competitiveness_panel

Estimate

  • Error: no outcome variable loaded; missing: ['local_batch06_derived']

Variables resolved

  • world_bank_wdi:NY.GDP.PCAP.KD.ZG → gdp_pc_growth (controls, publisher=world_bank_wdi, n=13897)

Variables missing data

  • local_batch06_derived (outcome, name=export_share) — vintage not on disk
  • local_batch06_derived (treatment, name=industrial_electricity_price) — vintage not on disk

Generated by scripts/run_panel_fe.py at 2026-06-29T17:52:06+00:00

Strongest opposing argument

Every hypothesis ships with its charitable opposing argument. The framework earns credibility by handling objections at their strongest, not weakest.

Authored framework. Read the transparency note.