IESET.
Hypotheses·energy·nuclear_share_power_price_volatility_panel

Higher nuclear electricity share predicts lower industrial power-price volatility and lower fossil electricity share.

PARTIALengine/runs/nuclear_share_power_price_volatility_panel

PARTIAL — coef=-0.001155, p=0.167 (above α=0.1); direction inconclusive

confidence cueThe result is useful, but not decisive. Treat it as a clue, not a settled conclusion.

policy briefMixed or noisy

In ordinary language

In plain terms, this asks whether nuclear electricity share is actually linked to better or worse co2 intensity from 1980 to 2024.

plain answer

The evidence is suggestive but not decisive. coef=-0.001155, p=0.167 (above α=0.1); direction inconclusive

why it matters

This matters because energy claims should change belief only when they survive a pre-declared empirical test.

how the test works

It compares 1 country or place units from 1980 to 2024, using a panel fe design, with fixed effects for country and year.

what was measured
What changed
  • Nuclear electricity share
What we checked
  • Co2 intensity
what this does not prove

A single test is not the whole truth. It narrows the claim under a specific sample, time period, and method. Strong policy conclusions need the pattern to survive nearby tests, alternative data, and serious objections.

verification

No evidence packet has been generated yet.

Results

engine/runs/nuclear_share_power_price_volatility_panel
1007550250198020022024GLOBAL
illustrative sketch · run pending
No coefficients yet. When the model fires, this chart will show co2_intensity across 1 sampled countries over 19802024.
The shapes above are stylised — none of the lines are real data.
Placeholder for nuclear_share_power_price_volatility_panel. Published chart will be generated from engine/runs/nuclear_share_power_price_volatility_panel/chart_data.json.

Who has skin in the game — schools predicting on this

17 schools list this hypothesis as a test of their position. The chips below are school-level scoreboard outcomes, not a second hypothesis verdict.

hypothesis verdict vs scoreboard outcome

The banner verdict judges this hypothesis as written. The scoreboard asks whether each school's polarity-corrected prediction was right. Raw status is not a school win: SUPPORTED supports schools that needed SUPPORTED, but refutes schools that needed REFUTED.

Pre-registration

registration ordering unverified
first-spec commit 4c8ce8e · 2026-07-18T22:11:21Z
run generated · 2026-06-29T17:52:09Z
Run timestamp predates this path's first git-add commit (rebase, rename, or pre-git local run). Spec hash is still the path's first-add commit — not repository HEAD — but ordering is not a clean pre-registration proof.

Higher nuclear electricity share predicts lower industrial power-price volatility and lower fossil electricity share.

Falsification criterion — what would disprove this

set before the run · honoured after

This hypothesis is considered falsified if:

SUPPORTED if the primary treatment coefficient has the pre-registered - sign at p<=0.10 with minimum sample gates. REFUTED if the coefficient has the opposite sign at p<=0.10. Otherwise PARTIAL; missing data or failed sample gates are INCONCLUSIVE_DATA_PENDING.

formal test & threshold
test:      panel_fe_nuclear_share_power_price_volatility_panel
threshold: [object Object]

Method

Template
panel_fe
Fixed effects
country, year
Clustering
country
Sample
1 countries · 19802024
Evidence type
associational

First-pass panel fixed effects screen. Multi-outcome or threshold language from the source backlog should be upgraded to a bespoke replication before scoreboard conversion.

Data

VariableSourceTransform
co2_intensity
outcome
owid:co2-intensitytier 2
level
nuclear_electricity_share
treatment
owid:share-electricity-nucleartier 2
level_lagged_one_year
log_gdp_pc
control
world_bank_wdi:NY.GDP.PCAP.KDtier 2
log
trade_openness
control
world_bank_wdi:NE.TRD.GNFS.ZStier 2
level
government_effectiveness
control
wgi:GE.ESTtier 4
level

ready  ·  pending  ·  reconstruct-needed

Detailed result card

Result card — nuclear_share_power_price_volatility_panel

Verdict: PARTIAL — coef=-0.001155, p=0.167 (above α=0.1); direction inconclusive

Pre-registration

  • Claim: Higher nuclear electricity share predicts lower industrial power-price volatility and lower fossil electricity share.
  • Falsification rule: SUPPORTED if the primary treatment coefficient has the pre-registered - sign at p<=0.10 with minimum sample gates. REFUTED if the coefficient has the opposite sign at p<=0.10. Otherwise PARTIAL; missing data or failed sample gates are INCONCLUSIVE_DATA_PENDING.
  • Falsification test: panel_fe_nuclear_share_power_price_volatility_panel

Estimate

  • Method: linearmodels.PanelOLS
  • Coefficient (treatment): -0.001155
  • Std error: 0.0008356
  • p-value: 0.167
  • Observations: 2775, countries: 125
  • Within R²: 0.152
  • Fixed effects: entity=True, time=True
  • Clustering: country

Variables resolved

  • owid:co2-intensity → co2_intensity (outcome, publisher=owid, n=16567)
  • owid:share-electricity-nuclear → nuclear_electricity_share (treatment, publisher=owid, n=6876)
  • world_bank_wdi:NY.GDP.PCAP.KD → log_gdp_pc (controls, publisher=world_bank_wdi, n=12104)
  • world_bank_wdi:NE.TRD.GNFS.ZS → trade_openness (controls, publisher=world_bank_wdi, n=10714)
  • wgi:GE.EST → government_effectiveness (controls, publisher=wgi, n=5168)

Generated by scripts/run_panel_fe.py at 2026-06-29T17:52:09+00:00

Strongest opposing argument

Every hypothesis ships with its charitable opposing argument. The framework earns credibility by handling objections at their strongest, not weakest.

Notes

Source shard: engine/audits/swarm_2026-05-22_200_hypotheses_worker_D_sectoral_data_rich.md. Backlog source families: OWID nuclear/fossil electricity, Eurostat prices.. Initial promotion pass left scoreboard mapping empty; mapped by the 2026-05-22 swarm scoreboard conversion v1.

Authored framework. Read the transparency note.