Sector-specific licensing regimes, concentration / quota allocation, state-controlled entry (energy, telecoms, healthcare, banking).
Product-market regulation, entry barriers, licensing burdens, network-industry regulation, price controls.
Targeted industrial and sectoral subsidies (renewable energy, chip manufacturing, agriculture, green hydrogen, etc).
Republic Act 9136 (EPIRA) signed 8 June 2001 by Arroyo, drafting substantially completed under Estrada. Restructured electricity sector: unbundled National Power Corporation (NPC) into generation (to be privatised), transmission (National Transmission Corporation, NTC, privatised to NGCP 2008), distribution (retained local utilities), system-operator (NGCP). Established Wholesale Electricity Spot Market (WESM) launched 26 June 2006 in Luzon. Created Energy Regulatory Commission (ERC) as quasi-judicial regulator. PSALM established to manage NPC debt and privatisation proceeds. Partial cross- ownership limits imposed between generation and distribution.
Per invariant 3, reforms are scored by what they did on each channel-separated axis, not by the party that enacted them. This fingerprint is how the policy-match engine finds historical analogues.
Explicit links are curated by the author. Inferred links are hypotheses in the library that test the same axes this policy moved — the framework's answer to "what does the data say about a policy like this?".
Ranked by axis-fingerprint overlap with this policy. Direction match bolded — those are the closest historical analogues. Shape of the match is what drives policy-outcome comparison, not the country or party label.