Targeted industrial and sectoral subsidies (renewable energy, chip manufacturing, agriculture, green hydrogen, etc).
Policy posture toward energy supply security — domestic production capacity, import diversification, strategic reserves, nuclear stance, fossil-fuel mix discipline.
Snowy 2.0 pumped-hydro expansion to the Snowy Mountains Scheme, a 2,000 MW / 350 GWh project announced 16 March 2017 by the Turnbull government. Funded through Snowy Hydro Limited following Commonwealth buyout of NSW and Victorian state shares (completed 2018) at A$6.2bn. Project subsequently ran over budget and schedule (revised cost estimate ~A$12bn, commissioning deferred to 2028-29). Represents recapitalisation of a state enterprise for long-duration storage, ahead of the NEG withdrawal.
Per invariant 3, reforms are scored by what they did on each channel-separated axis, not by the party that enacted them. This fingerprint is how the policy-match engine finds historical analogues.
Explicit links are curated by the author. Inferred links are hypotheses in the library that test the same axes this policy moved — the framework's answer to "what does the data say about a policy like this?".
Ranked by axis-fingerprint overlap with this policy. Direction match bolded — those are the closest historical analogues. Shape of the match is what drives policy-outcome comparison, not the country or party label.